Of 219 capital projects with an approved budget, 43 are red on schedule and 16 on budget. The explanations are the City’s own.

Road closures

Road closures

45 roads closed and 15 with delays, as the City records them. The City lists 71 in all; the rest carry no location we could place. The instruction under each is the City’s own wording.

  • 113 Avenue NWTotal Closure

    Utility Repair · 10 Jul to 31 Aug · Central

    113 Avenue will be total closed. Sidewalks also closed

  • 101 Avenue NWTotal Closure

    Utility Repair · 13 Jul to 1 Dec · Northwest

    *extended to Dec 1* 101 Av will be closed West of 138 St to Ravine Dr starting on July 13. Use other routes.

  • 102 Avenue NWTotal Closure

    Road Construction · 15 Jul to 31 Dec · Central

    Phase #2 (Replacing TDN #179): 102 Ave (Road and Intersections) will continue to be closed between 102 St and 103 St. On July 15, the 104 St / 102 Ave intersection will open and the 105 St intersection will close (See TDN#711). Additional changes to the 106 St / 102 Ave intersection are forthcoming but will be addressed in a new TDN once confirmed. The 103 St and 106 St bike facilities at 102 Ave will be detoured through the site, sometimes requiring a dismount and walk condition. Pedestrian access will generally be maintained on at least one side of each street.

  • 105 Street NWTotal Closure

    Road Construction · 15 Jul to 31 Dec · Central

    Starting July 15, the intersection of 105 St and 102 Ave will be closed to traffic. Pedestrian access will generally be maintained on at least one side of each street.

  • 129 Avenue NWTotal Closure

    Utility Emergency Repair · 16 Jul to 28 Aug · Northeast

    129 Avenue closed between 109 Street and 112 St. Detour using 132 Avenue.

  • 93A Avenue NWTotal Closure

    Utility Construction · 20 Jul to 2 Sep · Southeast

    93A Avenue total closure from 58 Street to 67A Street starting July 20 to September 2. Please use other routes.

  • 121 Street NWDirectional Closure

    Road Construction · 21 Jul to 31 Aug · Northeast

    121 St closed to Northbound traffic from 153 Ave to 161 Ave. Detour using 127 St or Castle Downs Road to drive Southbound on 121 St.

  • 100 Avenue NWTotal Closure

    Utility Repair · 28 Jul to 16 Sep · Northwest

    100 Av will be closed between 148 St and 147 St starting on July 28. Use other routes.

  • 182 Street SWTotal Closure

    Road Construction · 29 Jul to 15 Oct · Southwest

    Starts July 29th @ 9am. 182 St & 28 Ave SW intersection will be closed due to road construction. Use other routes.

  • 101 Street NWTotal Closure

    Road Construction · 29 Jul to 2 Sep · Southeast

    101 Street will be closed nightly between 19:00 and 6:00 the next day from 45 Avenue to 48 Avenue from July 29 to August 2.

  • 139 Street NWTotal Closure

    Utility Repair · 5 Aug to 8 Sep · Northwest

    The intersection of 139 St and 115 Av will be closed starting on August 5 until September 8. Use other routes.

  • 83 Avenue NWTotal Closure

    Special Event · 7 Aug to 27 Aug · Central

    Road segment closed to vehicle and bicycle traffic. Bicycles, please follow posted detour.

  • 84 Avenue NWTotal Closure

    Special Event · 7 Aug to 27 Aug · Central

    Road segment closed to vehicle traffic.

  • 184 Street NWTotal Closure

    Bridge Repair / Maintenance · 10 Aug to 30 Sep · Northwest

    184 St overpass on top of Yellowhead Tr will be closed starting at 9am on August 10. Access to WB 118A Av West of 184 St will be maintained.

  • 108 Street NWTotal Closure

    Utility Repair · 10 Aug to 11 Sep · Central

    Road segment closed to northbound & southbound vehicles.

  • 9 Avenue NWTotal Closure

    Road Construction · 16 Aug to 25 Oct · Southwest

    Starts Aug 16th @ 9am. 9th Avenue From 111 Street to 113 Street will be closed due to road construction. Pedestrian detour in place to the south. Use 12 Avenue.

  • 44 Street NWTotal Closure

    Utility Repair · 17 Aug to 7 Sep · Northeast

    44 Street will be closed between 119 Avenue and 120 Avenue. Pedestrian will be detoured to west sidewalk.

  • 100 Avenue NWTotal Closure

    Utility Repair · 17 Aug to 18 Sep · Central

    100 Avenue east of 105 Street to the alley west of 104 Street will be closed for Utility Repair work. Please use other routes.

  • 157 Avenue NWTotal Closure

    Road Construction · 17 Aug to 1 Sep · Northeast

    157 Ave closed from Castle Downs Road to the East side of 115 St. Detour using alternate routes.

  • Summit DriveTotal Closure

    Utility Repair · 18 Aug to 25 Aug · Northwest

    Summit Dr will be closed from approximately 160m East of 142 St to approximately 220m East of 142 St from August 18 to 25. Use other routes.

  • 76 Street NWTotal Closure

    Utility Construction · 18 Aug to 31 Oct · Central

    Road segment closed to vehicle traffic. Detour using alternate routes.

  • Coronet Road NWTotal Closure

    Road Construction · 20 Aug to 31 Aug · Southeast

    Coronet Rd from 86 St to 50m East of 86 St will be closed for road construction. Use other routes.

  • 96 Street NWTotal Closure

    Special Event · 20 Aug to 25 Aug · Central

    96 Street closed from 102 Ave to 103A Ave due to special event. Parking ban in effect. Detour using other routes.

  • 17 Street SWTotal Closure

    Road Construction · 21 Aug to 30 Sep · Southeast

    Staring August 21st 17 St SW from Ellerslie Rd to 500m south of Anthony Henday Drive will be closed for road construction. Use other routes and follow posted detour markers.

  • 123A Street NWTotal Closure

    Road Construction · 22 Aug to 5 Sep · Northeast

    123A Street closed from 161 Ave to 123 St. Local access maintained via back alley from 159 Ave.

  • 97 Street NWTotal Closure

    Road Mill & Overlay · 22 Aug to 29 Aug · Northeast

    97 Street and 137 Avenue intersection will be closed to thru and left turning traffic on Saturday, August 22 from 9PM until Sunday, August 23 at 9AM. Intersection will be closed again from Friday, August 28 from 9PM until Saturday, August 29 at 9AM. All traffic will be directed to right turn bays. Detour using alternate routes.

  • 81 Avenue NWTotal Closure

    Road Construction · 24 Aug to 19 Sep · Central

    Road segment closed to vehicle traffic.

  • 132 Avenue NWTotal Closure

    Road Construction · 24 Aug to 31 Oct · Northeast

    132 Ave closed from 82 St to Delwood Road. Sidewalks maintained on one side of 132 Ave at a time.

  • 97 Street NWTotal Closure

    Other · 24 Aug to 6 Sep · Central

    97 St closed from Jasper Ave - Okisikow Way (101A Ave) from 9am on August 24 - 8pm on September 06. Local access maintained on 97 St from 103A Ave to the closure point. Drivers are encouraged to detour on Jasper Ave, 100 St, 103A Ave and 95 St.

  • 91 Street NWDirectional Closure

    Road Mill & Overlay · 24 Aug to 26 Aug · Southeast

    Southbound directional closure of 91 St from 63 Ave - 51 Ave nightly from 9pm - 6 am. Follow posted detour routes.

  • 82 Avenue NWDirectional Closure

    Utility Construction · 25 Aug to 26 Aug · Central

    No left turns will be permitted from 82 AV westbound onto 104 ST southbound between 22:00hrs Aug.25, 2026 to 06:00hrs Aug.26, 2026.

  • Stadium Road NWTotal Closure

    Special Event · 26 Aug to 26 Aug · Central

    Stadium Road and Muttart Xing will be total closed for the Guns N Roses concert. 112 Ave eastbound will be reduced to a single lane from 90 St to Stadium Road. Starts at 4pm until 11:59pm.

  • 80 Avenue NWTotal Closure

    Utility Construction · 26 Aug to 11 Sep · Central

    Road segment closed to eastbound and westbound vehicles.

  • 34 Street NWTotal Closure

    Road Mill & Overlay · 26 Aug to 27 Aug · Southeast

    34 St & 34 Avenue Intersection will be closed from 10pm - 6am to complete a mill and overlay. Use other routes.

  • 105 Avenue NWTotal Closure

    Special Event · 26 Aug to 8 Sep · Central

    105 Ave will be total closed.

  • 98 Street NWDirectional Closure

    Utility Construction · 26 Aug to 26 Aug · Central

    Road segment closed to southbound traffic.

  • 94 Street NWTotal Closure

    Special Event · 28 Aug to 28 Aug · Central

    94 St, from 118 Ave south to alley will be total closed starting at 16:30 hrs and ending at 22:30 hrs.

  • 91 Street SWTotal Closure

    Road Mill & Overlay · 28 Aug to 30 Aug · Southeast

    91 St & Ellerslie Road intersection closure nightly from midnight to 6am. Right turns only at the intersection and detour eastbound Ellerslie Road. Use other routes.

  • Chappelle Drive SWTotal Closure

    Road Construction · 29 Aug to 29 Aug · Southwest

    August 29th only. Chappelle Drive SW will be closed from 28 Avenue to 141 Street for Road construction. Local access maintained. Detour using 141 Street SW.

  • Gateway Boulevard NWTotal Closure

    Road Mill & Overlay · 29 Aug to 30 Aug · Central

    Gateway Blvd closed at 63 AV to all directions of traffic travel between 22:00hrs Aug.29 to 09:00hrs Aug.30.

  • 98 Street NWTotal Closure

    Special Event · 30 Aug to 30 Aug · Central

    98 Street will be total closed from 9am to 5pm due to special event

  • 95 Street NWTotal Closure

    Special Event · 30 Aug to 30 Aug · Central

    Total Closures:

    • 95 St from 109A Ave (including intersection) to 108 Ave
    • 109A Ave from 95 St (including intersection) to 94 St
    • 108A Ave from 95 St to 94 St
    • Starting 8am. Cleared by 10pm.
  • 136 Avenue NWTotal Closure

    Utility Repair · 2 Sep to 21 Oct · Northeast

    136 Avenue will be closed between 113A Street and 112 Street. The alley, 113A street -112 Street & 134A Avenue 136 Avenue, will be closed for same work as well.

  • 114 Avenue NWTotal Closure

    Utility Repair · 7 Sep to 9 Oct · Northwest

    114 Av will be closed from 135 St to 139 St starting on September 7. Use other routes.

  • 112 Street NWTotal Closure

    Crane Lift · 11 Sep to 12 Sep · Central

    Road segment closed to vehicle traffic from 18:00hrs Sept.11 to 18:00hrs Sept.12.

  • 66 Street NWTravel Delays

    Rail Crossing Repairs · 3 Jul to 30 Apr 2027 · Northeast

    Starting July 3 at 10AM, 66 Street will be reduced to single lanes and split to the East for ~4.5 months, West sidewalk closed. Split to West after, with East sidewalk closed. Use other routes.

  • 153 Avenue NWTravel Delays

    Utility Construction · 13 Jul to 13 Jul 2027 · Northeast

    Starting after 9AM on Monday, July 13, 153 Avenue Westbound will be reduced to one inside lane from the West side of 97 St to the East side of Beaumaris Road. North sidewalk closed at worksite and detoured to 154 Ave, 101 St, 155 Ave, 102 St, and Beaumaris Road. Detour route markers and wayfinding signs will be installed.

  • Hiller Road SWTravel Delays

    Road Construction · 21 Jul to 31 Aug · Southwest

    Starts July 21. Both Westbound & Eastbound dedicated left turning lanes on Hiller Road SW will be closed at 170 St. East / West Left turns still maintained at the intersection. Expect travel delays.

  • 115 Avenue NWMajor Delays

    Concrete Pour · 28 Jul to 4 Sep · Central

    115 Ave will be reduced to a single lane each direction. No left turns permitted at 82 St. North sidewalk between 82 St to 40m east will be closed. Full lane capacity during Commonwealth Concert events.

  • 82 Street NWMajor Delays

    Concrete Pour · 28 Jul to 4 Sep · Central

    82 St northbound will be reduced to a single lane. No left turn at 115 Ave. East sidewalk between 115 Ave and 40m north will be closed. Full lane capacity during Commonwealth Concert events.

  • 109 StreetIncreased Travel Time

    Utility Repair · 30 Jul to 28 Aug · Central

    109 Street northbound left turn bay closed at 10m south of Jasper Avenue due to manhole repair. Left turn maintained from left through lane northbound.

  • 153 Avenue NWTravel Delays

    Road Construction · 5 Aug to 31 Aug · Northeast

    153 Avenue Eastbound from West of 127 St to West of 121 St reduced to a single inside lane for sidewalk/shared pathway construction work.

  • Gateway Boulevard NWIncreased Travel Time

    Special Event · 7 Aug to 27 Aug · Central

    Road segment reduced to two (2) lanes with speed reduced to 30km/hr.

  • 167 Avenue NWTravel Delays

    Road Construction · 11 Aug to 25 Aug · Northeast

    167 Ave will be split to the North or South side from 97 St to West of 76 St. Intersection closures at 95 St, 91 St, 88 St, 87 St, 84 St, 82 St when milling or paving through the intersections. Splits will be setup nightly at 8PM and removed by 6AM on weekdays, 9AM on weekends. Starting with a split to the North for ~4 nights, then a split to South for ~4 nights, then a split to North for ~4 nights, then a split to South for ~4 nights. Detour using other routes.

  • 142 Street NWTravel Delays

    Utility Repair · 16 Aug · Northwest

    Right lane closed northbound 142 St at Ravine Dr for repair work on a utility vault. Duration unknown at this time.

  • 98 Avenue NWIncreased Travel Time

    Utility Repair · 17 Aug to 18 Sep · Central

    Starts Monday Aug 17. 98 Ave, 95 St - 96A St reduced to single lane in each direction. Detour using other route.

  • Jasper Avenue NWTravel Delays

    Bridge Repair / Maintenance · 17 Aug to 1 Sep · Central

    Latta Bridge (Jasper Ave) east sidewalk will be closed and traffic will be reduced to a single lane for both directions

  • River Valley RoadIncreased Travel Time

    Utility Repair · 25 Aug to 25 Aug · Central

    EPCOR Drainage will be completing utility repairs along River Valley Road starting at 8 p.m. with work completed by 6 a.m. the following morning.

    • River Valley Road will be reduced to a single vehicle travel lane with vehicle traffic maintain in each direction using Flag Persons.
  • 115 Avenue NWIncreased Travel Time

    Tree Maintenance · 26 Aug to 26 Aug · Central

    115 Avenue Westbound from 86 to 87 Street will be closed from 9 am to 3:30 pm to remove a tree. Pedestrian will be detoured to the south sidewalk at the same location. Detour using 112 or 118 Avenue

  • Gateway Boulevard NWIncreased Travel Time

    Pavement Marking Installation · 1 Sep to 2 Sep · Central

    Gateway Blvd will be reduced to a single lane at 63 AV between 22:00hrs Sept.1 to 06:00hrs Sept. 2.

Roadwork

Roadwork

Work in progress on the road, and what it closes alongside it. Showing 24 of 475, the ones that affect somebody on foot, on a bike or parked. Where an impact is not listed the City did not state one — that is not the same as saying it is clear.

  • 102 Avenue NWAffects sidewalk, bike lane and parking

    Bridge Rehabilitation · 2025-09-15 to 2026-10-30

  • 107 Avenue Westbound NWAffects sidewalk, bike lane and parking

    Bridge Rehabilitation · 2025-09-15 to 2026-10-30

  • 142 Street Southbound NWAffects sidewalk, bike lane and parking

    Bridge Rehabilitation · 2025-09-15 to 2026-10-30

  • 149 Street Northbound NWAffects sidewalk, bike lane and parking

    Bridge Rehabilitation · 2025-09-15 to 2026-10-30

  • 149 Street Southbound NWAffects sidewalk, bike lane and parking

    Bridge Rehabilitation · 2025-09-15 to 2026-10-30

  • Stony Plain Road Eastbound NWAffects sidewalk, bike lane and parking

    Bridge Rehabilitation · 2025-09-15 to 2026-10-30

  • 102 Street NWAffects sidewalk, bike lane and parking

    Sewer Install · 2025-10-13 to 2026-12-31

  • Borden Park Road NWAffects sidewalk, bike lane and parking

    Drainage Repair Replace · 2025-12-01 to 2026-09-30

  • 102 Avenue NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-01 to 2026-12-31

  • 104 Avenue NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-01 to 2026-12-31

  • 110 Street NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-01 to 2026-12-31

  • 116 Street Southbound NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-01 to 2026-12-31

  • 156 Street NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-01 to 2026-12-31

  • 87 Avenue Eastbound NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-01 to 2026-12-31

  • 111 Street Northbound NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-11 to 2027-01-10

  • 111 Street Southbound NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-11 to 2027-01-10

  • 12 Avenue Eastbound NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-11 to 2027-01-10

  • 12 Avenue Westbound NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-11 to 2027-01-10

  • 23 Avenue Westbound NWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-11 to 2027-01-10

  • Ellerslie Road Westbound SWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-11 to 2027-01-10

  • Heritage Valley Trail SWAffects sidewalk, bike lane and parking

    Lrt Construction · 2026-01-11 to 2027-01-10

  • 52 Street NWAffects sidewalk, bike lane and parking

    Road Construction Rehab · 2026-03-30 to 2026-10-17

  • 113 Avenue NWAffects sidewalk, bike lane and parking

    Road Construction Rehab · 2026-04-06 to 2026-12-01

  • 123 Street NWAffects sidewalk, bike lane and parking

    Road Construction Rehab · 2026-04-06 to 2026-10-31

City Hall

City Hall

What council is about to decide, and how it voted on what it has already taken up. Meetings a resident can still speak at are marked.

What’s ahead

Tue 25 Aug

  • Time TBCPublic hearingBylaw 21496 · 5 itemsLast chance to speak5 rezonings

Wed 26 Aug

Mon 31 Aug

Tue 1 Sep

Wed 2 Sep

Tue 8 Sep

  • City CouncilCouncil Chamber, 2nd floor, City HallAgenda pending

Around the region

How council voted

City Council · 18 Aug

30 decisions, 10 of them contested. The first 4 are below, numbered by where they fell in the meeting; the other 6 are on the record. 20 more passed without opposition.

Bylaw 21551 be read a first time

Carried 11–2 split

11 for, 2 against

AgainstT. Parmar, K. Principe

ForA. Knack, R. Clarke, M. Elliott, M. Janz, J. Morgan, A. Paquette, E. Rutherford, A. Salvador, A. Stevenson, K. Tang, J. Wright

Moved by A. Salvador, seconded by A. Stevenson

Bylaw 21551 be read a second time

Carried 11–2 split

11 for, 2 against

AgainstT. Parmar, K. Principe

ForA. Knack, R. Clarke, M. Elliott, M. Janz, J. Morgan, A. Paquette, E. Rutherford, A. Salvador, A. Stevenson, K. Tang, J. Wright

Moved by A. Salvador, seconded by A. Stevenson

Bylaw 21551 be read a third time

Carried 11–2 split

11 for, 2 against

AgainstT. Parmar, K. Principe

ForA. Knack, R. Clarke, M. Elliott, M. Janz, J. Morgan, A. Paquette, E. Rutherford, A. Salvador, A. Stevenson, K. Tang, J. Wright

Moved by A. Salvador, seconded by A. Stevenson

Councillors M. Elliott, T. Parmar and E. Rutherford be endorsed to serve as Federation of Canadian Municipalities Non-Board Committee members for a one-year term from June 2026…

Carried 12–1 split

12 for, 1 against

AgainstM. Janz

ForA. Knack, R. Clarke, M. Elliott, J. Morgan, A. Paquette, T. Parmar, K. Principe, E. Rutherford, A. Salvador, A. Stevenson, K. Tang, J. Wright

Moved by A. Paquette, seconded by T. Parmar

Names are read from the official minutes. A division only runs here when the roll matches the tally the minutes declare, so nothing on this list is inferred. The full decision record