38 roads closed and 19 with delays, as the City records them. The instruction under each is the City’s own wording.
- 76 Street NWTotal Closure
Utility Construction · 18 Aug to 31 Oct · Central
Road segment closed to vehicle traffic. Detour using alternate routes.
- 132 Avenue NWTotal Closure
Road Construction · 24 Aug to 31 Oct · Northeast
132 Ave closed from 82 St to Delwood Road. Sidewalks maintained on one side of 132 Ave at a time.
- 121 Street NWTotal Closure
Road Construction · 31 Aug to 31 Oct · Northeast
121 St closed from Yellowhead Trail to South of Yellowhead Trail. Eastbound and Westbound thru movements only at the intersection. Detour using 156 St, St Albert Trail, 127 St, 107 St, or 97 St
- 136 Avenue NWTotal Closure
Utility Repair · 2 Sep to 21 Oct · Northeast
136 Avenue will be closed between 113A Street and 112 Street. The alley, 113A street -112 Street & 134A Avenue 136 Avenue, will be closed for same work as well.
- 96 Street NWDirectional Closure
Concrete Repair · 5 Sep to 1 Nov · Central
Road segment closed to northbound traffic.
- 114 Avenue NWTotal Closure
Utility Repair · 7 Sep to 9 Oct · Northwest
114 Av will be closed from 135 St to 139 St starting on September 7. Use other routes.
- 157 Avenue NWTotal Closure
Road Construction · 14 Sep to 5 Oct · Northeast
157 Ave closed between 119 St and 121 St. Pedestrians maintained on one side of 157 Ave.
- 34 Street NWTotal Closure
Utility Construction · 14 Sep to 16 Oct · Southeast
34 Street will be closed from Roper Road to 64 Avenue to construct a new culvert. Follow posted detour routes.
- 50 Avenue NWDirectional Closure
Utility Repair · 15 Sep to 6 Oct · Southwest
Starts Sept 15th. Northbound directional closure on 111A Street from 49 Avenue to 50 Avenue. Use other routes.
- 57 Street NWTotal Closure
Road Construction · 18 Sep to 7 Oct · Southeast
57 Street will be closed from 97 Avenue to 98 Avenue from September 18 to September 29. Please use other routes.
- 57 Street NWTotal Closure
Road Construction · 23 Sep to 9 Oct · Southeast
57 Street will be completely closed from 95 Avenue to 97 Avenue from September 23 to October 9. Please use other routes.
- 107 Street NWTotal Closure
Utility Emergency Repair · 23 Sep to 16 Oct · Central
Road segment closed to vehicle traffic.
- 81 Avenue NWTotal Closure
Utility Construction · 23 Sep to 14 Oct · Central
Road segment closed to vehicle traffic.
- 107 Street NWDirectional Closure
Utility Emergency Repair · 23 Sep to 31 Jan 2027 · Northeast
107 Street Southbound closed between the alley North of 130 Avenue to 129 Avenue. One Northbound curb lane remains open. West sidewalk closed from 129 Ave to 130 Ave.
- 52 Street NWTotal Closure
Road Construction · 25 Sep to 13 Oct · Southeast
52 Street will be completely closed from 93A Avenue to 94A Avenue from September 25 to October 13. Please follow the detour.
- Aspen Drive East NWTotal Closure
Utility Repair · 25 Sep to 10 Oct · Southwest
Starts Sept 25th. Aspen Drive East from 121 Street to 40 Avenue will be closed due to utility repair. Local Access maintained.
- 100 Avenue NWDirectional Closure
Utility Repair · 25 Sep to 17 Nov · Central
Westbound Directional Closure on 100 Ave from 105 Street to 104 Street, Eastbound traffic Maintained. Bike lane Closure, dismount and walk conditions in place. Please use other routes.
- 95A Avenue NWTotal Closure
Road Construction · 28 Sep to 8 Oct · Northwest
Total closure on 95A Ave from 10842 95A Avenue to 9508 180A Street.
- 112 StreetDirectional Closure
Utility Repair · 28 Sep to 16 Oct · Central
NB 112 ST DIRECTIONAL CLOSURE
- SB 112 ST LEFT TURN PROHIBIT TO 100 AVE
- WB 100 AVE RIGHT TURN PROHIBIT TO 112 ST
- 180 Street NWTotal Closure
Road Construction · 1 Oct to 13 Oct · Northwest
Total closure on 180 Street from 98Ave to 9606 180 Street.
- 52 Street NWTotal Closure
Road Construction · 1 Oct to 10 Oct · Southeast
52 Street will be closed from 94B Avenue to 95 Avenue from October 01 to october 10
- 83 Avenue NWTotal Closure
Utility Construction · 1 Oct to 31 Oct · Central
Road segment closed to vehicle traffic.
- 112 Avenue NWTotal Closure
Bridge Repair / Maintenance · 2 Oct to 5 Oct · Central
2nd Revision - End date extended to Oct 05 at 06:00hrs:
- 112 Avenue bridge over Wayne Gretzky Drive will be closed to traffic from 18:00hrs Oct 02 until 06:00hrs Oct 05. Use 118 Ave or 106 Ave to detour.
- 84 Avenue NWTotal Closure
Utility Construction · 2 Oct to 8 Oct · Central
Road segment closed to vehicle traffic.
- 102A Avenue NWTotal Closure
Utility Construction · 2 Oct to 23 Oct · Central
102A Avenue between 95 Street and 96 Street will be closed for Utility Construction. North sidewalk closure also in place. Local Access is maintained.
- 54 Street NWTotal Closure
Road Construction · 2 Oct to 9 Oct · Southeast
54 Street will be completely closed from millwoods Rd to 17 Avenue from October 02 to October 09. Please use other routes.
- Orchards Boulevard SWTotal Closure
Road Mill & Overlay · 3 Oct to 10 Oct · Southeast
Orchards Blvd SW closed from Rowan Close SW to 66 St SW due to mill and overlay. Detour using other route.
- 94A Avenue NWTotal Closure
Road Construction · 3 Oct to 14 Oct · Southeast
94A Avenue will be completely closed from october 3 to October 14. Please use other routes
- 151 Street NWTotal Closure
Utility Repair · 5 Oct to 9 Oct · Northwest
151 St will be closed from 95 Av to approximately 50m S of 95 Av starting on October 5. The sidewalk on the East side will also be closed. Use other routes.
- 18 Street NWTotal Closure
Road Mill & Overlay · 5 Oct to 5 Oct · Northeast
On October 5, from 7AM to 7PM, 18 Street will be closed from 153 Avenue to 1.2km South of 167 Avenue. Detour using Meridian Street.
- 87 Street NWTotal Closure
Utility Construction · 6 Oct to 23 Oct · Central
Road segment closed to vehicle traffic.
- 19 Avenue NWTotal Closure
Utility Construction · 7 Oct to 17 Oct · Southeast
19 Avenue will be closed from 81 St to 85 St. Local access will be maintained at all times. Use other routes.
- 106 StreetTotal Closure
Utility Repair · 9 Oct to 17 Oct · Central
106 Street total closure from 98 Avenue to 97 Avenue
- 134 Avenue NWTotal Closure
Rail Crossing Repairs · 9 Oct to 13 Oct · Northwest
134 Av will be closed between 149 St and 146 St (approximately 50m on each side of the rail tracks) starting at 9am on Friday, October 9. Use other routes. Local access will be maintained.
- 184 Street NWTotal Closure
Utility Construction · 13 Oct to 2 Nov · Northwest
184 Street will be closed from 66 Av to approximately 100m South of 66 Av. Use other routes.
- 84 Street NWTotal Closure
Utility Repair · 15 Oct to 16 Oct · Central
84 St will be total closed from Jasper Ave to 85 St starting 7pm until 6am. Jasper Ave will be reduced to a single lane each direction from 83 St to 87 St.
- Saskatchewan Drive NWDirectional Closure
Utility Repair · 19 Oct to 24 Oct · Central
Sask. DR westbound closed from 99 ST to 91 AV nightly between 20:00hrs to 06:00hrs. Eastbound traffic will be maintained.
- 99 AvenueTotal Closure
Utility Repair · 23 Oct to 31 Oct · Central
Total closure on 99 Avenue from 105 Street to The Alley East of 105 Street.
- 127 Avenue NWTravel Delays
Utility Emergency Repair · 29 Aug to 30 Oct · Northeast
127 Avenue reduced to single lanes and split to the South side of 127 Ave between 122 St and 124 St. Sidewalk detoured to the North along 128 Ave.
- 66 Street NWTravel Delays
Utility Construction · 9 Sep to 22 Oct · Northeast
66 St reduced to single lanes and split to the East side at 122 Ave.
- 87 Avenue NWTravel Delays
Utility Repair · 14 Sep to 31 Mar 2027 · Northwest
87 Av Reduced to 1 Lane in Each Direction
- 111 Street NWMajor Delays
Utility Construction · 20 Sep to 5 Oct · Southwest
Starts Sept 20th. 111 Street southbound from south of 29A Avenue to north of 23 Avenue will be reduced to a single lane due to Capital Line LRT utility construction. Expect major delays.
- Jasper AvenueIncreased Travel Time
Road Construction · 20 Sep to 30 Oct · Central
Starting at 10p.m. Sunday Sept 20, left turns are banned for eastbound and westbound traffic along Jasper Avenue at 116 Street due to lane sharing on north side of Jasper Avenue west of intersection.
- 109 StreetIncreased Travel Time
Utility Construction · 21 Sep to 30 Nov · Central
Beginning at 9 a.m. Monday September 21 the west approach to the High Level Bridge will be closed for EPCOR Drainage Utility Construction.
- 127 Street NWTravel Delays
Road Construction · 23 Sep to 14 Oct · Northeast
Northbound 127 St reduced to one inside lane at 132 Ave.
- Victoria TrailTravel Delays
Road Mill & Overlay · 23 Sep to 5 Oct · Northeast
Victoria Trail reduced to single lanes and split to the West side in stages between Yellowhead Trail and 144 Avenue NW. Setups nightly from 8PM to 6AM the next weekday morning, 9AM on weekend mornings.
- 107A Avenue NWTravel Delays
Utility Construction · 27 Sep to 13 Oct · Central
107A Avenue from 95 Street to 93 Street reduced to single lanes and traffic split for utility work from Sept 27th to Oct 13th.
- 97 Street NWMajor Delays
Utility Repair · 2 Oct to 7 Oct · Central
97 Street will be reduced to a single lane each direction.
- 85 StreetTravel Delays
Concrete Repair · 5 Oct to 9 Oct · Central
Full time southbound curb lane will be closed on 85 St from south of 98 Ave - 96 Ave.
- 107 Avenue NWTravel Delays
Traffic Signal Maintenance · 5 Oct to 26 Oct · Central
Traffic signal install on 107 Ave & 104 St. Delays include single lane closures during off-peak hours on both 107Ave from 105 Street to 103 Street and on 104 Street from 106 Avenue to 108 Avenue. Pedestrian detours in place during work.
- 82 Street NWTravel Delays
Road Construction · 5 Oct to 12 Oct · Northeast
82 Street Northbound curb lane closure from South of 132 Ave to 132A Ave.
- 51 Avenue NWTravel Delays
Utility Construction · 5 Oct to 10 Oct · Southwest
Starts Oct 5th. 51 Avenue from 122 Street to 116 Street will be reduced to a single lane per direction due to a water line install. Expect travel delays.
- Bellamy HillTravel Delays
Utility Repair · 5 Oct to 30 Oct · Central
Northbound 101 St right lane closed. Closures of the east sidewalk when crews are on site with local pedestrian access maintained up to the closure points. Full pedestrian access maintained via an on street pedestrian detour when crews are not on site.
- 137 Avenue NWTravel Delays
Utility Emergency Repair · 6 Oct to 9 Oct · Northeast
137 Avenue Westbound curb lane closure from East of Manning Drive to West of Manning Drive Southbound. 137 Avenue reduced to single lanes and split to the South side of 137 Avenue from West of Manning Drive Southbound to West of 56 Street. South sidewalk closed from Manning Drive Southbound to shopping mall access. Manning Drive Northbound reduced to one single northbound left turn lane. 56 Street closed from 137 Avenue to service road North of 137 Avenue.
- 82 Avenue NWIncreased Travel Time
Other · 7 Oct to 7 Oct · Central
82 AV eastbound reduced to a single lane between 09:00-15:00hrs.
- 82 Avenue NWIncreased Travel Time
Crane Lift · 10 Oct to 11 Oct · Central
Road segment will be reduced to a single lane in each direction and split to the south side between 22:00hrs Oct.10 to 06:00hrs Oct.11.
- 105 StreetTravel Delays
Utility Repair · 23 Oct to 31 Oct · Central
A Single lane closure from 98 Avenue to 100 Avenue far East lane. Expanding to a Double lane closure happening off-peak hours during 23rd and 24th of October. Keep Left.